Equipment Installation
In the Three Gorges Project, CGGC installed and put into operation four units (700MW each) within just one year, creating a world record.
In the installation of Gezhouba Water Conservancy Project, CGGC created national records in three aspects: annual installed capacity, annual installed number of units and installation progress, and was thus awarded the National Science & Technology Progress Prize.
In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.
With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently China's second largest and the world's third largest hydropower station.
CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.
CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.
CGGC was responsible for installing three homemade units (Nos. 5, 6 and 7 units) in the first phase of Longtan Hydropower Station Project.
For the Pubugou Hydropower station, CGGC installed two of the six units and the entire utility system.