Home/Our Business/Equipment Installation
In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.
Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project |
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.