Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Updated: 2014-04-01

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Electromechanical Equipment Installation at the Geheyan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.