Home/Our Business/Equipment Installation
CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.
Links
Privacy Statement
Terms of Use
Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.