With a design driving speed of 200km/h, the 291km railway is constructed in accordance with the construction standard for level-I railways.
The design driving speed and proportion of bridges and tunnels of this 61km railway is 100km/h and 83% respectively.
The 1260km passage is a double-line electric heavy-haul railway constructed in compliance with the construction standard for level-I railways.
Located in eastern part of Bamako, the capital city of Mali, the Bamako Third Bridge is an interchange bridge project connecting the north and south banks of the Niger River, and is an eye-catching landmark in the city.
This is a deck hung upside-down no-hinge steel pipe concrete arch bridge with a total length of 284.76m and steel fiber reinforced concrete pavement.
The project features high engineering precision and great construction difficulty, where the assembly & welding error is less than 2mm.
This is a pre-stressed concrete continuous rigid frame box girder bridge. The bridge is 520m long with 4 spans. The highest main pier of the bridge is 162.66m, ranking the 3rd in the world and the 2nd in Asia amongst similar bridges.
This is a two-way four-lane road bridge with a length of 667m and a clear width of 26m.