Home/Our Business/Road and Bridge Projects
With a design driving speed of 200km/h, the 291km railway is constructed in accordance with the construction standard for level-I railways.
It consists of 73 grand bridges, great bridges and medium bridges, and its proportion of bridges and tunnels is as high as 55.6%. The railway is invested and constructed by CGGC.
The Wuhan-Yichang High-speed Railway (China) |
The Wuhan-Yichang High-speed Railway (China) |
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.