Home / Global Operations / Africa
Africa
CGGC was the general contractor of FAN Hydropower Station in the form of EPC and undertook all the installation work of its electromechanical equipment and sub-systems.
The FGG 2x230KV Power Transmission Project undertaken by CGGC is a major project in Ethiopian power grid expansion.
In the construction of Tekeze Hydropower Station, the largest in Ethiopia, CGGC undertook the most difficult part with the highest technology content, that is, the double-curve thin-walled concrete dam.
The FAN Hydropower Station undertaken by CGGC in Ethiopia is the first EPC project constructed by a Chinese company in East Africa.
Links
Privacy Statement
Terms of Use
Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.