Home/Our Business/Equipment Installation

Installation of Bulb Tubular Turbine Generator Units at the Wangfuzhou Hydropower Station (China)

Updated: 2014-04-01

The Wangfuzhou Hydropower Station is equipped with four 27.25MW bulb tubular units to reach a total installed capacity of 109MW, generating 581 million KWH of electricity per year.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.