Home/Our Business/Municipal Projects
The project consists of waste interception, riverbed improvement, roads and bridges, clear water supplementation, waste water improvement and landscape greening, etc. The 6.8km-long river covers an area of 12 km2, and serves 650,000 people. When the project is launched, the flow interception rate of pipes will reach 4.47m/second, and the project will adopt such a high standard that it can resist floods at the speed of 79.5m/second which are rarely seen in a hundred years.
Waste Interception and Comprehensive Control Project on Jiancao River |
Links Privacy Statement Terms of Use Contact Us
Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.