China Daily Website - Connecting China Connecting the World
USEUROPE AFRICAASIA 中文Français

Sorry, the page you requested was not found.

Please check the URL for proper spelling and capitalization. If you're having trouble locating a destination on Chinadaily.com.cn, try visiting the Chinadaily home page

BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
Travel\City Tours

Beijing's growing backbone

By Liu Xin/Kong Xiangxin/Ji Xiang/Zhang Lili | China Daily | Updated: 2017-11-03 07:43

Beijing's growing backbone

Tourists look at the Palace Museum at the Jingshan Park. [Photo/Xinhua]

The capital's north-south axis reflects both Chinese culture and the country's history. Liu Xin and Kong Xiangxin report.     

Chinese architect Liang Sicheng, a pioneer of heritage preservation, says: "The unique beauty of Beijing's design is due to its zhongzhouxian."

The capital's north-south central axis, or zhongzhouxian, possibly the world's longest and greatest, according to the architect, has been extended and rejuvenated many times over the centuries.

The original zhongzhouxian during the Yuan Dynasty (1271-1368) stretched 3.7 kilometers. During the Ming (1368-1644) and Qing (1644-1911) dynasties, its length increased to 7.8 km, from Yongdingmen in the south to the Drum and Bell Towers in the north.

The axis was extended again in 2003 when the city prepared for the 2008 Olympic Games.

The Olympic Park is considered as one of the most important areas along the axis today.

Here the China Science and Technology Museum has been open to the public since 2009. Next door, the new China National Sinology Center building has been completed. And construction on the headquarters of the Asian Infrastructure Investment Bank began in September 2016.

Zhao Jin, operations director of Beijing Inno-Olympic Group Co Ltd, which is the Olympic Park's property management company, says the China Intangible Cultural Heritage Hall and the new site of the National Art Museum of China are also to be built along the zhongzhouxian.

Previous Page 1 2 3 4 5 6 Next Page

Today's Top News

Editor's picks

Most Viewed

China Daily Website - Connecting China Connecting the World
USEUROPE AFRICAASIA 中文Français

Sorry, the page you requested was not found.

Please check the URL for proper spelling and capitalization. If you're having trouble locating a destination on Chinadaily.com.cn, try visiting the Chinadaily home page

BACK TO THE TOP
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US