USEUROPEAFRICAASIA 中文双语Français
Regional/ Footprints

KMTC Tunnel Project

chinadaily.com.cn | Updated: 2018-11-14 14:32

The 8.83-kilometer KMTC tunnel is a water conveyance tunnel connecting the M Dam and the K Dam. Upon completion, it will improve flood control, water storage, and power generation in the reservoir. The main parts of the project include an 8.83-km water diversion tunnel, two aqueducts, and related structural works that will require drilling and blasting. This project is being carried out by Sinohydro Bureau 14 Co.

 

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US