Home/News

CGGC awarded over $0.4b contract from HIB in Libya

Updated: 2009-03-28

CGGC initially signed off a contract over $0.4 billion with HIB for the execution of Tripoli old city renewal Project on March 25, 2009.

The contract covers survey, evaluation, planning, design and construction of the infrastructures of two districts in southwest Tripoli, capital of Libya.

The total contract price of $406,200,000 is to be funded by the Employer of the Project. Total construction period is 48 months as of hand-over of the site.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.