Huaqiao International Service Business Park took six measures to effectively solve problems with their drainage system.
The first was to reconstruct drainage pipes in old communities and streets. Daily maintenance has been enhanced to keep the pipes, entries and exits in good conditions.
Second, the administration for industry and commerce and the department of environment protection were asked to manage and repair the blockages and breakage on the public drainage infrastructure.
Third, the water department has been required to take the construction of basic infrastructure into consideration when programming and designing the water system.
Fourth, a long-term and steady protective mechanism has been established to check and maintain the public drainage systems in the region.
Fifth, the drainage systems of the enterprises will be checked by the investment invitation bureau and the department of environment protection. The enterprises with bad drainage systems will be required to improve.
Lastly, pipes and wires should be reviewed before construction. Construction teams are asked to equip pipes and wires carefully so as to avoid unnecessary losses.
Days ago, many residents, streets and communities expressed to the government that there were many problems with the drainage system. Many restaurants dropped their leftovers into the drainage pipes. The construction underway also brought clumps. Some drainage pipes and wires were out of date. All the problems caused blockages, which brought inconvenience to the life of the local citizens.
|