Your’re Here : Home > News

Concreting of the first pool column finished for Qatar Mega Reservoir Package E

Updated: 2016-03-14

At midday of March 13th, concrete was placed into the first pool column of Qatar Mega Reservoir Package E, which officially launched the upper workflow of the pool construction.

The concrete column under placing was 11-meter high and endowed with difficulty in construction. It required extremely rigorous safety speculation and high quality standard. To make full preparation for concreting the column, the Project Division had arranged constructors to build scaffolds meeting the safety standard all around the column.

The swimming concrete casting for the first pool column verifies the feasibility of the original construction scheme and adds accumulative experiences to the following aerial work inclusive of columns and walls, as well as laying the foundation of No.2 Milestone for its smooth implementation.

> Links> Contact Us
Tel :+86-10-59525952 Fax : +86-10-59525951
Address: Tower F, Ocean International Center, 208 Ciyunsi Beili, Chaoyang District, Beijing (100025), P.R. China
Copyright © 2013 China Gezhouba (Group) Corporation. All rights reserved.