A passenger ship was led into a chamber of the Three Gorges Project permanent shiplock on a trial test June 16, 2003. The two-way five-step shiplock is able to pass 10,000-tonnage barge fleet. [newsphoto.com.cn]
Copyright 2002 By chinadaily.com.cn. All rights reserved.